            Technical problems easy to appear in transformer test
            Transformer measurement accuracy is high, measurement wiring is complex, coupled with the power frequency fundamental wave measurement, environmental interference is very large, therefore, often each equipment in the metrology Bureau verification qualified, after the combination of verification of the data is quite different.

            The accuracy of the transformer calibrator is not the most important indicator of the instrument. In the calibration regulation of the transformer, it is required that the test error of the whole circuit should not exceed 20% of the level of the tested transformer. In fact, it is required that the data displayed by the calibrator in actual work must be true and credible.

            1. Frequency selective filter performance of transformer calibrator.

            Transformer calibration is the measurement of fundamental wave. Because the error current waveforms of the standard and the transformer are greatly distorted (up to 500%) and modulated by high frequency interference, the calibrator must have good performance of frequency selection filtering, separation of fundamental wave and measurement.

            The factors causing the distortion are very complicated. In the test of the transformer with low precision (below 0.5 level) without saturated iron core compensation, the distortion is about 10%, and the influence is not obvious. The national standard requires the harmonic attenuation of the calibrator to be more than 32 dB, which is enough to meet the requirement of application. But when high precision or saturated iron core transformer is tested, this index is too low.

            There is no measurement in the domestic calibration of the project, and the general manufacturer often does not give indicators. When purchasing new instruments, users should compare with 2700, HGE2 or HE15 old-fashioned instruments to determine whether they are credible.

            2. The load of the calibrator and the matching with the standard transformer.

            The additional load brought by the calibrator to the tested transformer and the load brought by the calibrator to the standard transformer are strictly stipulated in the national regulations. The domestic metrological verification does not detect these indicators, and most manufacturers do not give them. But they are one of the main reasons for the different calibration data of different units.

            3, conductor load:

            Load Z reserves 0.06 ohm resistance for connecting wires (individual 0.05 ohm), so the sum of resistance of A, B and C wires in the diagram is 0.06 ohm. When the current transformer is rated at a small rated load (10VA), the resistance of the wire will greatly affect the data.

            4. Error of load point of voltage transformer

            The load line and the voltage sampling line of the calibrator should be separately drawn from the transformer terminal. If a common line is used, the test error will be introduced because of the voltage drop on the wire.

            5, wiring error is not standardized:

            With the development of the testing technology, the instrument manufacturer has developed a new standard transformer. The new standard has many advantages, such as two-stage current transformer, which can overcome the load matching problem between the standard transformer and calibrator. However, the use unit is still connected in the 1950s, but there is a greater error.

            6. Ground wire:

            Because it is power frequency measurement, space electromagnetic field and floating potential, which have great influence on the measurement, ground wire plays an important role in the measurement. The grounding wire must be correctly grounded according to the regulation, especially in the test above 0.05 level, or in the case of a high voltage.

            It is suggested that when purchasing instruments, users should choose a complete set of equipment factory with a long-term industry basis rather than a single unit factory. There are essential differences in the theory and experience of transformer testing between the two. Correct selection, the first can ensure that all the indicators of the instrument are attached to the requirements of the specification, the second wiring, instrument matching are through the planning and design of manufacturers, can avoid the use of errors, affect product quality.
            Next:Introduction to installation specification of current transformer
            Products
            Measuring current transformer
            Metering current transformer
            Protective current transformer
            Leakage (residual) protection device
            The zero sequence current transformer
            Voltage transformer
            Transmitter
            Meter
            common problem
            How to use the current transformer correctly?
            Introduction to installation specification of current transformer
            Technical problems easy to appear in transformer test
            Case
            Contact Us

            Address: No. 555 Shenze Road, Dongxi Industrial Zone, Jinhua, Zhejiang.
            Zip code: 321017

            Tel: 0579-82235395 82235362
            Fax: 0579-82235388
            Website: www.tenttruss.com

            E-mail: aokai@okdq.cn

            主站蜘蛛池模板: 人妻内射一区二区在线视频| 97在线视频免费| 99久久精品费精品国产一区二区 | 风流老熟女一区二区三区| japanesehd熟女熟妇| 骚包在线精品国产美女| 电车上强制波多野结衣| 成人自慰女黄网站免费大全| 国产成人亚洲综合网站不卡| 亚洲大片在线观看| 99热在线精品国产观看| 特黄熟妇丰满人妻无码| 小sao货水好多真紧h视频| 女人与zozo| 国内精品久久久久久久久| 国产精品天天在线午夜更新| 国产熟女乱子视频正在播放| 全部免费a级毛片| 中文字幕精品1在线| 青草视频免费看| 狠狠综合久久av一区二区| 武林高贵肥臀胖乳美妇| 成人无码Av片在线观看| 国产一级片免费看| 亚洲欧美日韩图片| 五月天综合婷婷| 91香蕉在线看私人影院| 香瓜七兄弟第二季| 日韩欧美成人免费中文字幕 | 国产一区二区三区在线观看影院| 四虎1515hh丶com| 亚洲一区中文字幕久久| 2021三级a电影大全| 欧美日韩亚洲一区| 国产精品第一区第27页| 亚洲熟妇无码AV不卡在线播放| 久久午夜无码鲁丝片午夜精品 | 日韩一级在线视频| 国产精品jizz在线观看直播| 又湿又紧又大又爽a视频国产| 亚洲色偷偷色噜噜狠狠99网 |