            Introduction to installation specification of current transformer
            1 the installation of the current transformer must be firm. The exposed metal part of the transformer shell should be reliably connected.

            2 The same set of current transformers should be installed in the same direction to ensure that the primary and secondary circuit currents of the current transformers are in the same direction and the nameplate can be easily observed.

            3. The secondary side of the current transformer is not allowed to open circuit. When only one secondary circuit is used for the secondary double-turn transformer, the other secondary circuit should be reliably short-connected.

            4 the low voltage current transformer can not be grounded on the two side. Because the conductors, watt-hour meters and transformers used in low-voltage metering devices have the same insulation level, the highest voltage they can withstand is basically the same; in addition, after the secondary windings are grounded, the insulation level of the primary circuit of the whole set of devices to the ground is reduced, which makes the watt-hour meters or transformers with insulation weaknesses easy to be damaged under high voltage (such as induced lightning strikes). Bad. It is better to reduce the damage caused by lightning damage to two sides.
            Previous:Technical problems easy to appear in transformer test/ Next:How to use the current transformer correctly?
            Products
            Measuring current transformer
            Metering current transformer
            Protective current transformer
            Leakage (residual) protection device
            The zero sequence current transformer
            Voltage transformer
            Transmitter
            Meter
            common problem
            How to use the current transformer correctly?
            Introduction to installation specification of current transformer
            Technical problems easy to appear in transformer test
            Case
            Contact Us

            Address: No. 555 Shenze Road, Dongxi Industrial Zone, Jinhua, Zhejiang.
            Zip code: 321017

            Tel: 0579-82235395 82235362
            Fax: 0579-82235388
            Website: www.tenttruss.com

            E-mail: aokai@okdq.cn

            主站蜘蛛池模板: 青青草原国产视频| 大学生美女毛片免费视频| 欧乱色国产精品兔费视频| 日韩精品黄肉动漫在线观看| 日日摸日日碰夜夜爽亚洲| 女人又黄的视频网站| 国产精品无码素人福利免费| 国产一进一出视频网站| 免费看国产曰批40分钟| 午夜国产羞羞视频免费网站| 亚洲高清中文字幕| 亚洲av无码国产精品色| 中国内地毛片免费高清| 5g996未满十八| 永久在线观看www免费视频| 日本乱理伦电影在线| 奇米四色在线视频| 亚洲色图欧美激情| 欧美亚洲国产第一页草草| 穿透明白衬衫喷奶水在线播放| 欧美日韩一区视频| 国语对白做受XXXXX在线中国| 国产h视频在线观看网站免费| 亚洲电影免费观看| a级毛片免费观看网站| 色综合久久久久久久久久| 激情三级hd中文字幕| 日本特黄a级高清免费大片| 在线观看污视频网站| 国产免费全部免费观看| 亚洲综合激情视频| a色毛片免费视频| 欧美xxxx喷水| 国产伦精品一区二区三区在线观看 | aaaaa毛片| 狠狠躁夜夜躁人人爽天天天天97 | 精品综合久久久久久98| 欧美日韩国产一区二区三区欧| 小泽玛利亚高清一区| 国产在线高清理伦片a电影| 亚洲色四在线视频观看|