Search for the keyword:
            News
            Produts
            How to use the current transformer correctly?
            Proper use of current transformer

            1. The connection of current transformer should obey the principle of series connection: the primary winding resistance should be in series with the circuit under test, and the secondary winding resistance should be in series with all instrument loads.


            2. according to the magnitude of the measured current, choose the appropriate change, otherwise the error will increase. At the same time, one end of the secondary side must be grounded to prevent the high voltage of the primary side breaking into the secondary low voltage side once the insulation is damaged, causing personal and equipment accidents.


            3. The secondary side is absolutely not allowed to open circuit, because once open circuit, the primary side of the current I1 all become magnetized current, resulting in a sudden increase in PHIM and E2, resulting in excessive saturation magnetization of the core, heating serious and even burning the coil; at the same time, the magnetic circuit after excessive saturation magnetization, so that the error increases. When the current transformer is working normally, the secondary side is close to short circuit. If the secondary side is suddenly opened, the excitation EMF will suddenly change from very small value to very large value. The magnetic flux in the core presents a seriously saturated flat-top wave. Therefore, the secondary side winding will induce a very high peak wave when the magnetic field passes through zero, and the value can reach thousands. Up to 10000 volts, endangering the safety of the staff and the insulation performance of the instrument.

            In addition, one side open circuit causes the two side voltage up to several hundred volts. Once it touches, it will cause electric shock. Therefore, there are short circuit switches on the two side of the current transformer, so as to prevent the primary side from opening. In the process of using, the circuit load should be removed immediately after the two side of the circuit is opened, then the car will be stopped. Everything is handled well before it can be reused.


            4. In order to meet the needs of measuring instruments, relay protection, circuit breaker failure judgment and fault filtering, 2-8 secondary winding current transformers are installed in generator, transformer, outlet, bus segment circuit breaker, bus circuit breaker, bypass circuit breaker and other circuits. For large current grounding system, it is generally arranged in three phases; for small current grounding system, it is arranged in two or three phases according to specific requirements.


            5. The installation location of the protective current transformer should be set according to the non-protective area of the main protective device. For example, if there are two sets of current transformers, and the position permits, should be located on both sides of the circuit breaker, so that the circuit breaker in the cross protection range.


            6. In order to prevent bus failure caused by bushing flashover of pillar current transformer, current transformer is usually arranged on the outlet line of circuit breaker or transformer side.


            7. In order to mitigate the damage caused by internal faults of the generator, the current transformer used in the automatic regulating excitation device should be arranged at the outlet side of the generator stator winding. In order to facilitate the analysis and find the internal fault before the generator is merged into the system, the current transformer used for measuring instruments should be installed at the neutral side of the generator.
            Previous:Introduction to installation specification of current transformer/
            Products
            Measuring current transformer
            Metering current transformer
            Protective current transformer
            Leakage (residual) protection device
            The zero sequence current transformer
            Voltage transformer
            Transmitter
            Meter
            common problem
            How to use the current transformer correctly?
            Introduction to installation specification of current transformer
            Technical problems easy to appear in transformer test
            Case
            Contact Us

            Address: No. 555 Shenze Road, Dongxi Industrial Zone, Jinhua, Zhejiang.
            Zip code: 321017

            Tel: 0579-82235395 82235362
            Fax: 0579-82235388
            Website: www.tenttruss.com

            E-mail: aokai@okdq.cn

            主站蜘蛛池模板: yy22.tv夜月直播| 免费看美女隐私直播| 国产日韩精品欧美一区| 国产精品无码MV在线观看| 国产美女一级毛片| 亚洲老妈激情一区二区三区| 亚洲精品国产成人| 久久亚洲欧美日本精品| 东北女人下面痒大叫| 两个人www免费高清视频| 99精品视频在线观看| 97日日碰曰曰摸日日澡| 8050午夜网| 羞羞色在线观看| 日本福利一区二区| 国产熟人AV一二三区| 四虎影视永久费观看在线| 又粗又硬又大又爽免费视频播放| 四虎永久在线免费观看| 亚洲综合精品伊人久久| 久久精品女人天堂AV| 丰满人妻熟妇乱又仑精品| 一级毛片在线完整免费观看| bollywoodtubesexvideos| 91麻豆国产极品在线观看洋子 | 国产精品一级片| 在线免费观看韩国a视频| 国产精品无码久久av| 国产三级在线免费观看| 合租屋第三部小雯怀孕第28章| 亚洲精品国产综合久久一线| 久久精品WWW人人爽人人| 一级特黄录像免费播放肥| 大胸喷奶水的www的视频网站| 老色鬼久久亚洲av综合| 精品人妻伦一二三区久久| 男女免费观看在线爽爽爽视频| 欧亚专线欧洲s码wmysnh48| 日本亚洲中午字幕乱码| 婷婷丁香五月中文字幕| 国内精品伊人久久久久妇|